Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3964.35
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Sep 12, 2007     Aileron attach fittings - (1.4 hours)       Category: Wings
Prepared the ailerons and their attach fittings by drilling the holes out to #12 size, deburring, and priming where needed, then bolted the attach fittings to the ailerons.

I attempted to attach the aileron pushrods to the bellcrank, but I'm missing an AN3-21A bolt. I have no idea why it's not in its drawer, but nobody at the airport, not even the maintenance shop, had a replacement one in stock. They had -20As and -22As, but no -21As. I'll order one tonight.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.